Specification
CONCENTRIC VENT KITS
Submittal Information
General Properties
Specification
Technical Date Sheet
Dakota Sourcing, LLC
601 N. 16th St.
Beresford, SD 57004
www.dakotasourcing.com info@dakotasourcing.com
Installation Tips
Part No. 22152-22153
Document No.
Date
Revision 01
Material: Polyvinyl Chloride (PVC)
Finish: Plain White
Standard: ASTM-D1785, ASTM-D1785, ASTM-F891, ASTM-D2665, ASTM-D2241, ASTM-D2661,
ASTM-F628, UL-1738.
NOTE: The Concentric Vent reduces the allowable intake/vent piping length by 5 feet from that listed in the
basic furnace installation instructions.
Each concentric vent kit contains the following items:
(1) Combustion Air Inlet Cap
(1) Air Inlet Pipe
(1) Vent Pipe
(1) Intake/Vent Concentric “Y” Tee
(1) Installation Instructions on box
● Pipe and fittings are required to complete installation (user supplied). The combustion air and vent pipe fittings must
conform ANSI and ASTM standards D1785, F891, D2665, D2241, D2661, or F628. Pipe cement and primer must
conform to ASTM standards D2564 or D2235.
● In Canada, construct all combustion air and vent pipes for this unit of CSA or ULC certified Schedule 40 PVC,
PVC-DWV, or ABS-DWV pipe and pipe cement. Dakota Sourcing Concentric Vent Kits meet UL-1738 or ULC-S636
requirements.
● For specific operation, please refer to the instruction book on the box.
NOTE: Please refer to furnance installation instructions to obtain pipe sizing information. Some local code inspectors are
not familiar with concentric vents. Be sure to check local code requirements and acceptability prior to installation.
●
Do not use the Concentric Vent kit for anything other than a Category IV furnace. Failure to follow this warning could
result in fire, personal injury or death.
● Do not operate the furnace until the installation and assembly of the Concentric Vent and all piping are completed.
Failure to follow this warning could result in product damage or improper operation, personal injury or death.
● Recirculation of flue gasses may occur, causing the intake pipe to freeze shut during cold weather operation if the
venting system is not installed per these guidelines. If the venting system is not installed properly, flue gas may
recirculate, possibly causing the intake pipe to freeze shut during cold weather.
● Birth Defects, Reproductive Harm,and Cancer- www.p65warnings.ca.gov
2020-01-20
SPEC22152
Warning
Maintain 12” minimum (18” for Canada) clearance above highest
anticipated snow level. maximum of 24
” above roof.
Combustion Air
Roof weather
Seal/Flashing
(field supplied)
Support
(field supplied)
Combustion Air
ElobW
(field supplied)
Typical Roof Install
NOTE: Securing strap must be field installed to prevent
movement to termination kit in side wall
Combustion air
Vent
1” Combustion
air inlet
vanes to wall
Combustion Air
Elbow
(field supplied)
Vent
Strap (field supplied)
Max 60 ”
Sidewall Termination Details
NOTE:Read the entire instruction manual before starting the installation.
Concentric Vent Kit Dimensions
Max 60”
Vent
● Cut only one hole instead of tradditionally cutting two holes through roof or side wall for exhaust and intake pipes
to complete installation.
● The concentric design make intake fresh air cut off exhausting smoke. Preferred vertical roof termination which is
less susceptible to damage, reduces the chance of intaking contaminants, and has less visible vent vapors. Horizontal
side wall termination installation.Dakoat Sourcing also provide side wall horizontal termination kit as more options.
Vent screens are available for necessary applications.
● The Concentric Vent reduces the allowable intake/vent piping length by 5 feet from that listed in the basic furnace
installation instructions.
Features
●

