Use and Care Guide

5
INSTALLATION INSTRUCTIONS
Hardware Used
AA
Bolt x 4
BB
Washer x 4
x 4
DD
Sink Clamp
EE
Lock Washer x 4
3. Place the sink clamps (DD) in the proper
position above the pre-threaded holes in
the stone top. Using Bolts (AA) Lock
Washers (EE) and Washers (BB) secure
Sink Clamps (DD) to the bottom of the
Stone Top (B).
Tip: check that the sink placement is well
centered front to back and side to side of
the stone top cut out before allowing the
silicone adhesive to dry. If the sink is not
centered well unscrew sink clamps,
readjust the sink position and re-tighten
the sink clamps.
4. Clean area where the vanity (A) will be
permanently located prior to beginning
installation, ensuring the vanity (A) will not
interfere with any water supply and drain lines
once mounted.
Locate wall studs and mark locations. With the
help of another adult, place completed Vanity
Cabinet Assembly to its final location. Adjust
the height of the Vanity Cabinet (A) by
twisting the adjustable leveler foot pins on the
bottom of each leg. Twist clockwise to
decrease height or twist counter-clockwise to
increase vanity height.
Using hardware appropriate for your wall type
(not included), secure Vanity Cabinet (A) to
two wall studs anywhere through the Vanity
Mounting Plates. Be careful not to disturb
any electrical or water lines that may be
concealed in the wall.
4
A
Mounting
Plate
3
B
D
AA
EE
BB
DD
BACK
BACK