Technical Specifications

P. 10
FIGURE 1
(
CONTINUED
)
Typical P3 Floor Joist Framing and Construction Details
All nails shown in the details below are assumed to be common nails unless otherwise noted� 10d box nails
(0�128 x 3”) may be substituted for 8d common (0�131 x 2-1/2”) as shown in details� Individual components are
not shown to scale for clarity
2e
2c
2f
2d
LOAD TRANSFER WITH PASS THRU BLOCKING DETAIL
P3 JOIST AS RIM JOIST DETAIL
Transfer load from above to bearing below� Install squash blocks per 2d�
Match bearing area of blocks below to post above�
PARALLEL END P3 JOIST DETAIL
SQUASH BLOCK DETAIL
Pair of Squash Blocks
Vertical load transfer
capacity per pair of
squash blocks (lb)
3-1/2” wide 5-1/2” wide
2x lumber 3800 5900
1-1/8” APA Rim Board,
Rim Board Plus, or
Rated Sturd-I-Floor 48 oc
2600 4000
1” APA Rim Board or
Rated Sturd-I-Floor 32 oc
1900 3000
Provide lateral bracing per 2a, 2b, or 2c�
Wall sheathing,
as required
Use single P3 Joist for loads up to 2000 plf and double P3 Joist for loads up
to 4000 plf (filler block not required)� Attach P3 Joist to top plate using
8d nails at 6” o�c�
Provide backer for siding attachment unless nailable sheathing is used�
APA Rim Board may be used in lieu of P3 Joist� Backer is not required
when APA Rim Board is used�
Squash block
APA Rim Board
blocking panel per 2a
+ 1/16” for
squash blocks
P3 Joist rim
joist per 2a
Attach rim joist to floor joist with one nail at top and bottom�
Nail must provide 1” minimum penetration into floor joist�
For 2-1/2” and 3-1/2” flange widths, toenails may be used�
Minimum 1-3/4”
bearing required
Attach P3 Joist per 2b�
Attach rim joist to top plate per 2a�