Installation Guide

QUICK TIPS
15
All installers should learn and follow “best practices” in order to deliver a better job for their customer and reduce
callbacks.
DO:
Follow local and national building codes.
Follow WRCLA installation instructions.
Purchase from WRCLA members, distributors and retailers.
Use construction techniques to create easy drainage planes to shed water accumulations.
Finish Western Red Cedar ASAP! Factory nish or apply coatings prior to installation if possible. Always touch
up eld cuts.
Acclimatize’ Western Red Cedar siding before you install it.
Use the correct fasteners: 304 or 316 grade stainless steel, aluminum, or hot dipped galvanized
(as per ASTM A-153).
Nail all Western Red Cedar siding into 1¼ of solid wood.
Ensure butt joints are made over solid wood to provide secure nailing. Join two pieces of siding with a
mitered butt joint.
Visit: RealCedar.com or call 866 778 9096 for more information.
DO NOT:
Allow Western Red Cedar to ‘Weather’ before applying a nish coating to the Cedar.
Use electroplated or mechanical galvanized fasteners that do not conform to ASTM A-153.
Install Western Red Cedar siding without acclimatizing.
Fasten Western Red Cedar siding only to the sheathing material.
Nail through two layers of siding.
Fail to nish the end cuts during installation.
Attempt to ‘blind nail’ bevel siding/clapboards.
Install or paint over wet siding.
Use caulking sealant as a substitute for ashing.
Place siding in direct contact with concrete, masonry, top soil, mulch, patios, porches and/or roofs.
SECTION III SIDING INSTALLATION QUICK TIPS