Unit installation

15
prior to turning on the UV unit,
the following must be verified:
With water flowing through the system, ensure that
there are no system leaks and no piping connection
leaks.
All earth ground connections are properly made.
All lamp connections are properly made.
The socket covers are secured to both ends of the UV
treatment unit.
1. Verify that all incoming power conductors, including the
ground conductor, are properly terminated.
2. Turn on the electrical power to the UV unit.
3. Observe the UV Lamp Operational Display panel. All
yellow lights produce a steady glow after 3 minutes time.
Operate 10 more minutes and recheck. The UV unit is
now ready for operation.
Turn the power off until actual operational start-up
begins.
CAUTION! Rapid successiveCAUTION! Rapid successive
CAUTION! Rapid successiveCAUTION! Rapid successive
CAUTION! Rapid successive
cycling of the power to thecycling of the power to the
cycling of the power to thecycling of the power to the
cycling of the power to the
ballasts can cause prematureballasts can cause premature
ballasts can cause prematureballasts can cause premature
ballasts can cause premature
failure of the systemfailure of the system
failure of the systemfailure of the system
failure of the system
components.components.
components.components.
components.