Instruction manual
Upstream Instruction Manual
Released on 1-May-14 – R800001Q Page 10 UV Pure Technologies Inc. © 2014
TO MOUNT
USE #12 OR
1
4" DIA. SCREW
(4-PLACES)
NPT MALE
WIPER
CLEARANCE REQUIRED
TO REMOVE WIPER
C
27.75"
[705]
23.75"
[603]
20.00"
[508]
27.63"
[702]
39.75"
[1010]
25"
[635]
35.75"
[908]
21.38"
[543]
32.00"
[813]
WATER IN, Ø
WATER OUT, Ø
9.0 [228]
1"
1"
1
1
2"
1"
NCi15-50
NC15-50
DS15
DSi15
NCi15-75
NCi10-50
NC15-75
NC10-50
DSi10
DS10
NCi10-75
NC10-75
FRONT
PANEL
DSi30_1
1
2
"
DS30_1
1
2
"
NCi30-75_1
1
2
"
NC30-75_1
1
2
"
DSi30_1"
DS30_1"
NCi30-75_1"
NC30-75_1"
27.63"
[702]
39.75"
[1010]
27.75"
[705]
7.5 [191]
3.5 [89]
32.27"
[820]
24.52"
[623]
28.27"
[718]
32.27"
[820]
Figure 1A
home or facility. The unit must be upstream of any chlorine injection system.
Warning: If connection is made to a potable water system, the system shall be
protected against backflow.
Time Required
Please note that full installation of the Upstream requires shutting off the main
water supply for a number of hours. If disinfection is necessary, all pipes must be