Product Manual
Page 6 of 11
Specific Operation Warnings
⚠WARNING
To prevent serious injury or property damage, read and understand the owner’s manual.
Do not exceed lowest rated load capacity in hitch system.
Maintain an adequate vertical down (tongue) load to maintain control of the trailer (generally 10%)
without exceeding the specified rated capacities.
Other steps and inspections are also required. Consult OSHA, D.O.T. regulations, and American
Trucking Association for complete coupling and uncoupling procedures.
Ensure all bolts are torqued to 95 ft./lbs. before use.
Keep safety chains in place and in working order. Never operate the product without the safety
chains attached to vehicle.
Towing
⚠WARNING
Trailers and equipment designed for on-road towing within the stated capacities. For off-road
applications, reduce the capacities listed above by 25%, and use in conjunction with a swivel-type
drawbar.
Mounting
1. Use a secure mounting structure of sufficient strength to support the rated capacity of the hitch in
accordance with SAE J 849B.
2. The hitch receiver on the vehicle needs to have a 2
1/2
" square tubing inside.
3. Insert the adjustable mount into the receiver of the vehicle, then insert a 5/8" diameter bolt or pin
through the cross hole in receiver, using a lock nut or locking pin, to secure the bolt or hitch pin
(not included), as indicated below.
Before Each Use
1. Inspect for proper operation.