Technical data

7.2. Workaday maintenance 36
7.2.1. Lubricant plan and lubricant preparation 37
7.2.2. Blocking, raising and jogging along preparation 37
7.2.3. Disassembly of front wheel 38
7.2.4. Wheel disassembly of main undercarriage 38
7.2.5. Mending the tyre 38
7.2.6. Electrical system voltage 39
7.2.7. Tolerance and setting up values 39
7.2.8. Supporting and subordinate construction 39
7.2.9. Special assembly, controlling and setting preparations 39
7.2.10. Special tools 39
7.2.11. Materials for small reparations 39
7.2.12. Changing the fuel filter in the engine area 39
7.2.13. Maintenance of airscrew SR 2000 xa 40
7.3. Contract revision 41
7.4. Periodical revision after every 50hours 41
7.5. Periodical revision after every 100hours 41
7.6. Periodical revision after every 200hours 41
7.7. Periodical revision after every 300hours 41
7.8. Jacking points on the plane 42
7.9. List of labels and their placing 42
8. Airplane repairs 43
8.1. Repairs of connection screw 43
8.2. Repairs of rivet joints 43
8.3. Pilotage repairs 43
8.4. Airframe repair 43
8.5. Fuel system repairs 43
8.6. Engine repairs 44
8.7. Electroinstalment and appliance repairs 44
8.8. Revision of electroinstalment 44
9. Engine Rotax 912/912S maintenance 45
9.1. Oil refill 45
9.2. Sparking plugs 45
9.3. Refregarating liquid 45
9.4. Service life of the plane, revisions and inspection of the engine 46
9.5. Service life of rubber parts of engine 47
10. Label set 48
4