Instructions / Assembly
Issued/Revised:
35
DC-SAPLING w/ROOF
2
1
34
2
5
1
CM
0
INCH0
10961114815
7
12 13
4
365
01/31/19
800.458.5872
www.ultraplay.com
STEP 7
1. Slide Clock Panel and Handhold-Even onto the Upright Posts, making sure that the pipes on the Handhold Brackets are inserted into the
bottom holes of the Handholds correctly. IMPORTANT: Panels and Handholds must slide over post simultaneously. Warning label must
be positioned outwards.
UPRIGHT POST, 51 7/8" LG.
(02-08-0141)
HANDHOLD-EVEN
(02-08-0143)
WARNING LABEL
IMPORTANT: WARNING
LABEL MUST BE
POSITIONED OUTWARDS
CLOCK PANEL
(02-08-0011)