Instructions / Assembly

Issued/Revised:
01/31/19
FOOTING DETAIL - IN-GROUND
800.458.5872
www.ultraplay.com
23
(02-08-0171)
Parts List Footing Package -for- SAPLING INGROUND (02-08-0171)
PART NUMBER
QTYDESCRIPTION
ITEM
02-08-01398
FOOTBUCK ASSEMBLY
1
02-08-0162
4
FOOTBUCK2
33-11-000316
M10 x 25mm (1") BHCS BOLT
3
33-11-0005
4
M10 x 35mm (1 3/8") BHCS BOLT
4
33-11-040020
M10 LOCK NUT
5
IMPORTANT: Never install play equipment over hard, unresilient surfaces such as asphalt, concrete,
or compacted earth. It is the owner's responsibility to ensure the "minimum area required" contains an
appropriate amount of resilient material to cushion accidental falls.
SITE PREPARATION
Clear area of any debris and level surface. Equipment is designed to be installed on a level surface
013
1
UPRIGHT
POST
3
5
SURFACING
GROUND
CONCRETE
PLACE BRICK OR EQUIVALENT
IN THE BOTTOM OF ALL
FOOTINGS TO PREVENT POST
FROM SINKING INTO THE GROUND
45° REF.
TYP.
PLATFORM MOUNTING
BRACKET
014
4
5
2
SURFACING
CONCRETE
GROUND
12 in
[30.48 cm]
TYP.
SLIDE MOUNTING
BRACKET
4
5
017
2
SURFACING
CONCRETE
GROUND
12 inØ