User's Manual

isfacinginthedirectionofthedevice.
Onceallsensorsareplacedontopofthegroundinthecorrectzones,gobacktothe
abovegrounddeviceandrestartit(ifaPH100‐Bdevice)orstartthesensorpairing
activity.
3.Gobacktothezoneonesensor.Digaholeusingasmallshovelorahole‐cutter
approximatelyoneandquartertimesthelengthofthesensorandthreetimesthe
width(keepinginmindtheorientation.Burrythesensorandensureitisheardat
theintendedBaseStationorController.
PlacementofTheSensor
1.Usinga1.5”puttyknifeorsomethingsimilar,createahorizontalslitinthesoil,so
thecenteroftheslitis1.5”to1.75”belowthetopofthesoilandwithintheroot
zoneoftheplant.
2.Takesomedirtfromtheholeandperformafieldtesttoidentifythesoil’sphysical
propertieswhichwillbeusedlaterforsettingthezoneWetnessSettings(fieldtest
instructioncanbefoundinthemanualinAppendixB).
3.Turnthesensoronusingtheturnswitchatthebacksideofthesensor.Ensure
steps4–6arecompletedwithin1minuteofpoweringonofthesensor.Makesure
thewhiskerisattachedtothesensorbodypriortopoweringonofthesensor.
4.Insertthesensorbladeintotheslityoucreatedwithoutwigglingorapplyingany
side‐to‐sidepressureonthesensorblade.
5.Placethewhisker,loopsidedownsothatthetopisoutofthegroundatalevel
thatisclosetothelengthofthegrassorwhereitcanbecoveredbyathinlayerof
mulch,(Ifsensorislocatedinaplantingbed).
6.Burythesensorandwhisker,makingsuretopackthesoilfirmlyasyoufillthe
holeandplacetheturfcapbackon.
Operations
Oncethesensorisinstalleditwillrequirenointerventionfromuser,withthe
exceptionofchangeofbattery.Thedevicereportsitsbatterylevel.