Installation Guide

8
17
10.
11.
12.
9.
Insert 4 Cam Locks (C) into
the cam ways in the Pad (B)
(Fig. 20) and lock them
using the Lock Tool (E).
(Fig. 21)
Continue assembly by
locating additional Piers (A)
with the Pier Template (F)
(Fig. 22 through 25) in the
manner previously
described in steps 8,9 &
10.
(NOTE: be sure to level
each Pier (A) and secure
with Anchor Spikes (D).
(Fig. 26)
Insert Cam Locks (C) into
the 4 cam ways in each
additional Pad (B) (Fig. 27)
and lock all Cam Locks (C)
using the Lock Tool (E).
(Fig. 28)
Place a Pad (B) onto the last
2 Piers (A) installed, and
onto 2 of the first 4 Piers
(A) installed. (Fig. 18 & 19)
Fig. 18
Fig. 19
Fig. 20 Fig. 21
Fig. 22 Fig. 23
Fig. 25 Fig. 26
Fig. 24
Fig. 27 Fig. 28
5.
6.
7.
4.
Nivele cada Pier(A) adicion-
al con el adyacente Pier
(A),observe la (Fig. 10) e
instale los Picos de ajuste
(D) (Fig. 11).
(NOTA: remueva la plantil-
la del PIER despues de que
todos los PIERS han sido
nivelados y ajustados al
piso.)
Coloque un Pad (B) encima
de cada uno de los 4 Piers
(A) instalados (Fig.12) e
inserte 4 Cam Locks (C)
dentro de cada uno de los
camways en el Pad (B).
Fig.13.
Gire cada uno de los Cam
locks (C) en el sentido de las
manecillas del reloj 90 grados
usando la Lock Tool (E).(Fig.
14 y 15)
(NOTA: el Cam Lock C dejara
de girar y asegurara la
posicion correcta al llegar a
los 90 grados.)
(NO APRIETE MAS DE LO
INDICADO!)
8.
Coloque los 2 siguientes
PIERS (A) en linea con
cualquiera de los 2 Piers
(A) previamente instalados
usando la Plantilla F para el
Pier . (Fig.16) Nivele cada
nuevo Pier (A) e instale los
Picos de ajuste (D) .
(Fig.17)
Ponga 3 Piers (A) adicion-
ales y localizelos de acuer-
do a la Plantilla (F) para el
Pier. (Fig. 8 y 9)
(NOTA: el cuadrado impre-
so en la Plantilla (F) para el
PIER indica una esquina
exterior.)
Fig. 8
Fig. 9
Fig. 11
Fig. 10
Fig. 13
Fig. 12
Fig. 15
Fig. 14
Fig. 17
Fig. 16