Instruction Manual
6X Series Liquid-Cooled Transmitter Chapter 5, Maintenance
Instruction Manual, Rev. 0 5-4
Table 5-1: 6X Transmitter normal record, inspection and maintenance schedule
6X Transmitter
Normal Record, Inspection and Maintenance Schedule
Type of Record or Inspection Check Data Recording or Inspection Interval
Daily
Weekly Monthly Quarterly Half Year
Yearly
Record a full set of Operating Readings.
X
Check performance for FCC Compliance.
X
Carrier Frequency Measurement and Correction
X
Analysis and Correction of Transmitter Upper and Lower Sideband
Response.
X
Power Measurement and Correction.
X
Check and Correct Parameters and Settings of the Output Amplifiers.
X
Check and correct all appropriate protection trip circuits
X
Verify Local and Remote Metering Calibration.
X
X
Check and Clean or Change Filters
X
Check Cooling System for Leaks
X
Check Cooling Fluid Level
X
Ethylene Glycol/Distilled Water Mixture Concentration Check
X
Ethylene Glycol/Distilled Water Mixture PH Level Check
X
Inspection of High Voltage lines
X
Inspection of Heat Exchangers for Leaks, Corrosion etc.
X
Inspection of Heat Exchangers Fans and Lubrication.
X
Visual check of Power Amplifiers condition, including voltage cable
forms, resistors and capacitors and miscellaneous hardware
X
Visual check of sub-systems power supplies
X
Visual check of all Fans, Blowers and Pumps in the system for
normal operation and any signs of wear or overheating
X
Verify proper operation of all Interlock and Ready Status Switches
X