User's Manual
P a g e | 13
Step 8: With this installation is complete, to enable the I-cloud function of data logger, please refer to next chapter
“Communication System Enable “.
WARNING
Make sure the AC cable and terminator do not touch the roof, using cable clips or tie wraps secure AC
trunk cable with structure/racking. Ensure that all cabling is securely located under the PV module and
away from roof surface.
WARNING
Correct AC grounding and short circuit protection must be provided to ensure operational safety.
WARNING
Although the AC trunk cable includes an EGC, the continuous grounding conductor or grounding
washers is still required.
POST-INSTALLATION
WARNING
Service or Changes to your electrical system should be carried out only by qualified electricians.
WARNING
Do not attempt to repair this product; it does not contain user-serviceable parts. Repairs and internal
servicing should only be performed by UBIQUITI authorized service personnel.
Commissioning and Operating
Turn on the AC disconnector or the circuit breaker of each micro inverter string.
Turn on the main utility-grid AC circuit breaker. System will start producing power after five minutes.
(Optional Monitoring System) Depending on the strength of the signal, it can take up to 2 hours before the
monitoring system detect all the micro inverters in the PV system. For more information on the monitoring system,
refer to the PV Monitoring System user’s manual.