Technical data
PD_OpManPS-4_05_us.fm
page 34  PacDrive PS-4 / PD-8 ELAU AG
5 Maintenance
Hard-copy for correction
Fig. 5-4: Wire the PS-4/
 connection cable PS-4/PD-8 and fix the strain relief on the cable 
duct while the cable is relieved
.
 Insert the prefabricated SERCOS cable into the outlet and snap 
it on. Fix the strain relief on the cable duct while the cable is 
relieved
.
 If more PD-8s are connected, connect prefabricated "PD-8/PD-
8" connection cable with the power in/out connections and the 
next SERCOS cable with SERCOS in/out as described above.
CAUTION!
Penetrating liquid due to inexpert installation of cable ducts or 
missing blind plugs!
Damage to electrical parts!
 Check if the cable ducts are tight.
 Immediately replace missing or defective blind plugs on unused 
cable ducts. Do not run the PD-8 without having fixed the blind 
plugs and checked if they are tight.
 Do not run the PD-8 while the cover is open. Before starting the 
plant, close the cover and check if it is tight.
See also "Technical Data" on page 47.
SCL_Ansch_us.fh8
SERCOS connection (SCL)
power supply connection
jumper for termination
SERCOS cable cable duct
dummy plug
cap nut
fuse










