User's Manual
CHAPTER 5
SHIPMENT, LIMITED STORAGE, AND DEMOLITION
TO PREVENT ENEMY USE
Section I. SHIPMENT
46. Disassembly of Equipment
a. Operate all switches and
AND LIMITED STORAGE
their controls to their safety posi-
tions (par. 15d) and disconnect the tube tester from the ac power
supply.
b. Remove the power cord plug from the ac source.
c. Wind the power cord around the brackets on the front panel
and insert the plug into the dummy power cord receptacle that
is mounted on the front panel.
d. Close the case and latch it securely.
47. Repackaging for Shipment or Limited Storage
(fig. 11)
The exact procedure for repackaging depends on the material
available and the conditions under which the equipment is to be
shipped or stored. Adapt the procedures outlined below whenever
circumstances permit. The information concerning the original
packaging (pars. 8 and 9) will also be helpful.
a. Material Requirements. The following materials are required
for packaging the tube tester.
For stock numbers of materials,
consult SB 38-100.
Material
Quantity
Waterproof wrapping paper ---------------------------------
Fiberboard, corrugated, single-face (flexible) ------------------
Tape, pressure-sensitive adhesive, waterproof (3-inch) ---------------
Tape, paper, gummed (sealing and securing) (3-inch) __________
Strapping, flat, steel
(
5
/
8
-
x 0.02-inch) _ __ __ ____________
Strapping seals -------------------------------------------------------
Wooden shipping box (19¼ x 18¼ x 10 inches inside dimen-
sions).
18 sq ft
35 sq ft
12 ft
10 ft
13 ft
2 each
1 ea
55