Specifications

28
2. Type B Chimney Connector - a type B chimney
connector can be used to transmit the ue gases
provided ue gas temperature entering the chimney
connector is greater than 310°F.
3. Type L Chimney Connector - a type L vent or
other suitable material shall be used for a chimney
connector if the temperature or exiting temperature
is less than 310°F.
REGNAD
ehttaegapeesetasnednocfosngisynA
-midetcepsniebllahsyenmihcehtfoesab
ngisaebyamnoitarolocsidehT.yletaid
em
deidemerebtsumdnaegamadyenmihcfo
.yletaidemmi
C. DRAFT
1. The natural draft generated through a chimney is
dependent on several factors including, chimney
height, temperature of ue gases, cross section area
of chimney, chimney wall insulation value, dilution
air and total volume of ue gases, to name a few.
Make sure that the boiler has been running for at
least 5 minutes before measuring the draft.
2. Minimum Draft at Breech (Canopy) – The draft
induced by a chimney must create at least a
pressure of 0 (zero) inches water column (“ w.c.)
at the pressure tapping on the canopy mounted
on rear of boiler (see Figure 18). The pressure
at the canopy cannot be positive since this could
create a condition that allows ue gas by-products
to escape from the draft regulator. A negative
pressure reading up to -.03 inches water column
is acceptable for proper operation. (See Table 6,
Burner Speci cations at the rear of this manual for
more details)
3. Minimum Over re Pressure – The over re
pressure is another piece of information that is
often measured, however this should be done for
observation purposes only! The breech pressure
must be used to qualify the draft condition. See
Table 6 for more details as a guide. Actual draft and
temperature measurements may be different then
those values in the table.
D. STACK TEMPERATURE
1. The temperature of the ue gases has a signi cant
effect on the amount of draft created in a vertical
chimney as well as the propensity to create
condensate. The higher the stack temperature, the
greater the amount of draft that can be generated. A
lower stack temperature not only reduces the amount
of draft that can be created but it also increases the
possibility that the ue gases could condense in the
chimney connector or stack.
2. NFPA 31 and CSA B139-04 have information to
help the installer make an appropriate choice of
venting materials. In some cases a chimney may
have to be lined to create suf cient draft. In other
cases, the chimney may have to be lined to prevent
the corrosion of a masonry chimney. Consult
with a chimney specialist knowledgeable on the
requirements for chimney requirements in your area.
NOITUAC
royenmihcafonoitidnocehtnotbuodynA
dnanoitarenegehttneverpotytilibasti
tsum,etasnednocsageulffonoitalumucca
detinU(13APFNotgnidroccadenilereb
.)adanaC(931BASCro)setatS
NOITUAC
.ediugasaselbatgnitnevyenmihcehtesU
-redrobynatahtdednemmocerylhgihsitI
gninilerehtnitluserdluohsnoitacilppaenil
tahtrenilelbatiusahtiwyenmihcehtfo
tsniagatcetorpotdnatfardtneiciffussetaerc
.etasnednocsageulfybdesuacnoisorroc
3. Baf es – The ef ciency of the boiler is based on the
insertion of ue baf es supplied with your product.
Under no circumstances are other baf es to be
used on this product. The baf es are installed in
the 2
nd
pass (two inner ueways) on the MPO147,
MPO189 and MPO231. The baf es on the MPO84
are installed in the 3
rd
pass only. Refer to Section
II, Item F, Paragraph 7 for baf e installation. If
there is any doubt on the application of this boiler
on the intended chimney, consult with your local
code of cials. At a minimum, remove the baf es
to increase the stack temperature. See Table 6 for
temperature differential (T) with baf es IN and
OUT. In addition, the lower the CO
2
level the
higher the stack temperature.
Figure 18: Smokebox Pressure Tapping for
Checking Draft at Breech