Quick Start Guide
QUICK START GUIDE
u-line.com
22
Install top hinge and door:
1.  
install the pivot screw in the same hole from the 
opposite surface.
2.  Rotate door 180 degrees and position door onto 
bottom hinge.
3.  Align long edge of the hinge with the outer edge of the 
unit.
4.  Tighten three screws and replace hinge cover.
5.  Replace hinge cover.
Align and adjust the door:
Align and adjust the door (see DOOR ALIGNMENT AND 
ADJUSTMENT)
Top Hinge
Right Side
Top Hinge
Left Side
Pivot
Screw
1
Turn to Adjust
General Installation
LEVELING INFORMATION
1.  Use a level to 
level. Level should 
be placed along top 
edge and side edge 
as shown.
2.  If the unit is not 
level, adjust the legs 
on the corners of the unit as necessary.
3.  
repeat the previous steps as needed.
INSTALLATION TIP
opening, adjust the rear legs to achieve a total unit rear 
height of ” (3 mm) less than opening’s rear height. 
Shorten the unit height in the front by adjusting the front 
legs. This allows the unit to be gently tipped into the 
opening. Readjust the front legs to level the unit after it is 
correctly positioned in the opening.
INSTALLATION
1.  Plug in the power/electrical cord.
2.  Gently push the unit into position. Be careful not 
to entangle the cord or water and drain lines, if 
applicable.
3.  Re-check the leveling, from front to back and side to 
side. Make any necessary adjustments. The unit’s top 
surface should be approximately ” (3 mm) below the 
countertop.
4.  Install the anti-tip bracket.
5.  Remove interior packing material and wipe out the 
inside of the unit with a clean, water-dampened cloth.










