Quick Start Guide
QUICK START GUIDE
u-line.com
14
USER GUIDE
u-line.com
Integrated Panel Installation
QUICK START GUIDE
Integrated Panel Installation 1
u-line.com
SAFETY • INSTALLATION & INTEGRATION • OPERATING INSTRUCTIONS • MAINTENANCE • SERVICE
Integrated Panel Installation
1. Fully open door/drawer.
2. Starting at corner, pull 
gasket away from door/
drawer.
3. Continue to pull gasket 
free from gasket channel.
4. Upon removal, lay gasket 
down on a flat surface.
5. Partially loosen the 3 screws, securing the top hinge to 
the cabinet.
6. Align the panel with the outside edge (opposite the 
hinge) and high enough to align with the highest point 
in the door/drawer.
7. Insert panel underneath top hinge and apply upward 
pressure while bringing the lower portion of the panel 
flush to the door inside the lower hinge. The panel will 
fit snuggly
8. Align door with cabinet. Tighten the top 3 screws, 
securing the top hinge to the cabinet. 
NOTICE
Due to differences in floor construction or 
surrounding cabinetry, the panel may not sit 
flush with the top of the door/drawer.
9. Secure integrated 
panel to door/drawer 
using clamps. A 
robust tape may also 
be used. U-Line 
recommends the use 
of bar clamps to 
secure the panel to 
the door/drawer. If 
using tape, be 
certain the tape will 
not damage panel 
finish upon removal.
10.Using a 7/64" (3 mm) 
drill bit, drill 6 pilot 
holes into the wood 
panel 1/2" (12 mm) 
deep using the holes in the door/drawer frame as a 
guide.
NOTICE
It is important to ensure that all drilled holes are 
drilled to the correct depth in order to avoid 
splits in the wood when hardwood is installed.
11.Locate 6 of the #6x 1-1/4" (32 mm) screws provided 
with your unit.
Align Panel
Against
Door/Drawe
Edge First
Align Top Of Panel With Highest Point Of Door/Drawer
Door
Panel
Wood
Panel
Door/Drawer
Bar 
Clamp
Bar 
Clamp
(Amended)
USER GUIDE
u-line.com
Integrated Panel Installation
USER GUIDE
Integrated Panel Installation 2
u-line.com
SAFETY • INSTALLATION & INTEGRATION • OPERATING INSTRUCTIONS • MAINTENANCE • SERVICE
12.Using a Phillips screwdriver, place one screw into each 
of the 6 pilot holes and screw down. Do not overtighten 
screws.
13.Be sure the screws force their way past the opening on 
the gasket channel and sit flush against the bottom of 
the channel.
14.Remove clamps from door/drawer.
NOTICE
If panel requires additional adjustment after 
removing clamps, slightly loosen each screw and 
adjust panel as necessary. Tighten screws upon 
completion.
15.Starting at the corners, re-install the gasket into the 
gasket channel in the frame. Make sure the gasket is 
fully seated. This may take some force.
Integrated Panel
Integrated Panel










