Quick Start Guide

QUICK START GUIDE
u-line.com
9
USER GUIDE
u-line.com
General Installation
2. Install adapter plate to unit with 4 long screws and nuts
(a) then place foam rubber gasket on top - open holes
aligned (b).
3. Insert all 4 hoses into the opening.
4. Install tower to unit with 4 short Philips screws.
NOTE: It will be necessary to press down rmly while
tightening the screws. Compressing the foam rubber gasket
ensures an airtight seal between the unit and the tower.
Connect Hoses to Tower
Your tower comes with two hoses already attached.
1. Attach gas jumper hose - line up and press in rmly.
Note: The connector at the end of the gas jumper line is
narrower to correspond with the connection in the tower.
2. Attach liquid jumper hose - line up and press in rmly.
Note: The connector at the end of the liquid jumper line is
wider to correspond with the connection in the tower.
Install Tower on Refrigerator
Do not remove all the protective lm on the stainless
exterior until the tower is installed.
1. Remove four Phillips screws (secured with nuts on
the inside of the refrigerator) and lift o cap to reveal
tower mounting hole. Peel back enough lm for tower
to clear.
Rubber Gasket
Adapter Plate
4 Long Screws
Foam Rubber Gasket
4 Short Screws
Metal Ring
4 Nuts
4 Acorn Nuts
a
b