User Guide & Service Manual

USER GUIDE
u-line.com
General Installation
2. Install adapter plate to unit with 4 long screws and nuts
(a) then place foam rubber gasket on top - align holes (b).
3. Insert all 4 hoses into the opening.
Note: 2 of the connections inside tower have color banding to


refrigerator.
4. Install tower to unit with 4
short Philips screws.
NOTE: It will be necessary

tightening the screws.
Compressing the foam rubber
gasket ensures an airtight seal
between the unit and the tower.
Connect Hoses to Tower

installing tower onto refrigerator.
1. 
Note: The connectors at the ends of the gas jumper hoses
are narrower to correspond with the connections in the
tower.
2. Attach liquid jumper hoses - line up and press in

Note: The connectors at the end of the liquid jumper hoses
are wider to correspond with the connections in the tower.
Install Tower on Refrigerator

exterior until the tower is installed.
1. Remove four Phillips screws (secured with nuts on

tower mounting
hole. Peel back

tower to clear.
Rubber Gasket
Adapter Plate
4 Long Screws
Rubber Gasket
4 Short Screws

4 Nuts
4 Acorn Nuts
a
b
11