User Guide & Service Manual
USER GUIDE
u-line.com
General Installation
2. Install adapter plate to unit with 4 long screws and nuts
(a) then place foam rubber gasket on top - align holes (b).
3. Insert all 4 hoses into the opening.
Note: 2 of the connections inside tower have color banding to
refrigerator.
4. Install tower to unit with 4
short Philips screws.
NOTE: It will be necessary
tightening the screws.
Compressing the foam rubber
gasket ensures an airtight seal
between the unit and the tower.
Connect Hoses to Tower
installing tower onto refrigerator.
1.
Note: The connectors at the ends of the gas jumper hoses
are narrower to correspond with the connections in the
tower.
2. Attach liquid jumper hoses - line up and press in
Note: The connectors at the end of the liquid jumper hoses
are wider to correspond with the connections in the tower.
Install Tower on Refrigerator
exterior until the tower is installed.
1. Remove four Phillips screws (secured with nuts on
tower mounting
hole. Peel back
tower to clear.
Rubber Gasket
Adapter Plate
4 Long Screws
Rubber Gasket
4 Short Screws
4 Nuts
4 Acorn Nuts
a
b
11