Quick Start Guide
QUICK START GUIDE
5
u-line.com
4. Remove caps from screw heads on opposite side (2 on 
top and 2 on bottom). Using #2 Phillips bit remove the 
4 underlying screws. Reinstall the screws and caps on 
the opposite side.
5. Partially install screw #1 in the outer most holes on top 
and bottom. Rotate door 180°, align hinge over screw 
#1 and slide/seat into position. Reinstall screw #2 on 
top and bottom. Tighten both screws and install hinge 
cover.
Align and adjust the door:
Align and adjust the door (see DOOR ALIGNMENT AND 
ADJUSTMENT).
General Installation
LEVELING INFORMATION
1. Use a level to confirm 
the unit is level. Level 
should be placed along 
top edge and side 
edge as shown. 
2. If the unit is not level, 
remove grille and 
adjust legs as 
necessary. Use 
included tool to adjust 
the height of the rear legs.
3. Confirm the unit is level after each adjustment and 
repeat the previous steps until the unit is level.
INSTALLATION TIP
If the room floor is higher than the floor in the cutout 
opening, adjust the rear legs to achieve a total unit rear 
height of 1/8" (3 mm) less than the opening’s rear height. 
Shorten the unit height in the front by adjusting the front 
legs. This allows the unit to be gently tipped into the 
opening. Adjust the front legs to level the unit after it is 
correctly positioned in the opening.
INSTALLATION
1. Plug in the power/electrical cord.
2. Gently push the unit into position. Be careful not to 
entangle the cord.
3. Re-check the leveling, from front to back and side to 
side. Make any necessary adjustments. The unit’s top 
surface should be approximately 1/8" (3 mm) below 
the countertop.
4. Install the anti-tip bracket.
5. Remove the interior packing material and wipe out the 
inside of the unit with a clean, water-dampened cloth.
2
1
2
1
Rotate Clockwise to raise rear leg. 
Rotate Counter-Clockwise to lower leg.
Rotate Front Legs to Adjust










