Quick Start Guide
QUICK START GUIDE
4
u-line.com
General Installation
LEVELING INFORMATION
1. Use a level to confirm 
the unit is level. Level 
should be placed along 
top edge and side 
edge as shown. 
2. If the unit is not level, 
remove grille and 
adjust legs as 
necessary.
3. Confirm the unit is level after each adjustment and 
repeat the previous steps until the unit is level. 
INSTALLATION TIP
If the room floor is higher than the floor in the cutout 
opening, adjust the rear legs to achieve a total unit rear 
height of 1/8" (3 mm) less than the opening’s rear height. 
Shorten the unit height in the front by adjusting the front 
legs. This allows the unit to be gently tipped into the 
opening. Adjust the front legs to level the unit after it is 
correctly positioned in the opening.
INSTALLATION
1. Plug in the power/electrical cord.
2. Gently push the unit into position. Be careful not to 
entangle the cord.
3. Re-check the leveling, from front to back and side to 
side. Make any necessary adjustments. The unit’s top 
surface should be approximately 1/8" (3 mm) below 
the countertop.
4. Install the anti-tip bracket.
5. Remove the interior packing material and wipe out the 
inside of the unit with a clean, water-dampened cloth.
Integrated Panel Installation
1. Fully open door.
2. Starting at corner, pull 
gasket away from door.
3. Continue to pull gasket 
free from gasket channel.
4. Upon removal, lay gasket down on a flat surface.
5. The panel should be aligned with the outside edge 
(opposite the hinge) and high enough to align with the 
highest point in the door. 
NOTICE
Due to differences in floor construction or 
surrounding cabinetry, the panel may not sit 
flush with the top of the door.
2
1
Rotate Front and Back Legs to Adjust
Align Panel
Against
Door Edge
First
Align Top Of Panel With Highest Point Of Door










