Service manual
16
Service Information
Toachievetherequiredlevelsofevacuation,a
properlymaintainedtwostagevacuumpumpin
goodconditionisrequired.Itisabsolutelyessential
tomaintainyourvacuumpumpaccordingtothe
manufacturer’sinstructionsincludingrequired
oilchangesattherecommendedintervals.
Vacuumpumpoilshouldalwaysbechangedafter
evacuatingacontaminatedsystem.
Vacuumpumpperformanceshouldbechecked
periodicallywithamicrongauge.
1. Makecertainthatchargingcylindervalve,
handshut-offvalve,andmanifoldgauge
valvesareclosed.
2. Startvacuumpump.
3. Openhandshut-offvalveandslowly
openbothmanifoldvalves,turning
counterclockwise,fortwofullrotations.
WARNING
R-134a systems are particularly susceptible
to moisture contamination which can only
be prevented by evacuating the system for a
minimum of 30 minutes to attain a minimum
29.9 inch (500 micron or lower) vacuum.
4. Operatethevacuumpumpforaminimum
of30minutestoaminimumof29.9”(500
micron)vacuum.
NOTE
OnproductswithLowsideleaksyoumustheat
thecrankcaseareaofthecompressorthough
outthe30minutesyouarerunningyourvacuum
pumptopullavacuumonthesystem.Every4
to5minuteswhileyouarerunningyourvacuum
pumpandheatingthecrankcaseareashake
thecompressor.Byheatingthecrank-caseyou
areheatingtheoilinthecompressor.Thiswill
drivethemoistureoutoftheoil.Byshakingthe
compressorthiswillallowthemoisturetocometo
thetopoftheoilfastersothevacuumpumpcan
removethemoisturefromthesystem.
CAUTION
If high vacuum equipment is used, just
crack both manifold valves for a few minutes
and then open slowly for the two full turns
counterclockwise. This will prevent the
compressor oil from foaming and being drawn
into the vacuum pump.
Evacuating SystemEquipment Needed for Evacuation &
Recharging:
• Heatedchargingcylinder
• Standard3-portmanifoldgaugeset:
-4charginghoses
-Teettingwithvalvecorestemremoved
(RobinairNo.40396)
-Handshut-offvalve(RobinairNo.40380)
• Twostagevacuumpump
• Processtubeadapterkit(RobinairNo.
12458)
• Tubingcutter
• Pinch-offtoolcapableofmakingleakproof
seal
• Completebrazingtorchset
• Small3-cornerle
• GritclothorScotch-Brite
• 45%silversolderandux
• HeatGun
Installing Evacuation and Recharging
Equipment
1. Disconnectrefrigeratorfromelectricalsupply.
2. Ifcompressorwasreplaced,installcorrect
sizedprocesstubeadaptoronprocesstube.
Ifcompressorwasnotreplaced,cutprocess
tubewithtubingcutterleavingasmuchtube
aspossibleandinstallcorrectsizeprocess
tubeadaptor.
3. Installcorrectsizedprocesstubeadaptoron
high-sideprocesstube.
4. Attachrefrigerationservicegaugemanifold
tosysteminfollowingorder:
• Low-side(compoundgauge)hosetosuction
sideprocesstubeadaptor.
• High-side(pressuregauge)hosetohigh-side
processtubeadaptor.
• Centerportmanifoldhosebeforehandshut-
offvalvetochargingcylinder.
• Centerportmanifoldhoseafterhandshut-off
valvetovacuumpump.