User's Guide
USER GUIDE
Integrated Panel Installation 1
u-line.com
SAFETY • INSTALLATION & INTEGRATION • OPERATING INSTRUCTIONS • MAINTENANCE • SERVICE
Integrated Panel Installation
1. Fully open door/drawer.
2. Starting at corner, pull 
gasket away from door/
drawer.
3. Continue to pull gasket 
free from gasket channel.
4. Upon removal, lay gasket down on a flat surface.
5. The panel should be aligned with the outside edge 
(opposite the hinge) and high enough to align with the 
highest point in the door/drawer. 
NOTICE
Due to differences in floor construction or 
surrounding cabinetry, the panel may not sit 
flush with the top of the door/drawer.
6. Secure integrated 
panel to door/drawer 
using clamps. A 
robust tape may also 
be used. U-Line 
recommends the use 
of bar clamps to 
secure the panel to 
the door/drawer. If 
using tape, be 
certain the tape will 
not damage panel 
finish upon removal.
7. Using a 7/64" (3 mm) 
drill bit, drill 6 pilot 
holes into the wood 
panel 1/2" (12 mm) 
deep using the holes in the door/drawer frame as a 
guide.
NOTICE
It is important to ensure that all drilled holes are 
drilled to the correct depth in order to avoid 
splits in the wood when hardwood is installed.
8. Locate 6 of the #6x 1-1/4" (32 mm) screws provided 
with your unit.
9. Using a Phillips screwdriver, place one screw into each 
of the 6 pilot holes and screw down. Do not overtighten 
screws.
10.Be sure the screws force their way past the opening on 
the gasket channel and sit flush against the bottom of 
the channel.
Align Panel
Against
Door/Drawer
Edge First
Align Top Of Panel With Highest Point Of Door/Drawer
Door
Panel
Wood
Panel
Door/Drawer
Bar 
Clamp
Bar 
Clamp
Integrated Panel
Integrated Panel