User Guide & Service Manual
USER GUIDE
General Installation 1
u-line.com
SAFETY • INSTALLATION & INTEGRATION • OPERATING INSTRUCTIONS • MAINTENANCE • SERVICE
General Installation
LEVELING INFORMATION
1. Use a level to 
confirm the unit is 
level. Level should 
be placed along top 
edge and side edge 
as shown.
2. If the unit is not level, adjust the legs on the corners of 
the unit as necessary.
3. Confirm the unit is level after each adjustment and 
repeat the previous steps until the unit is level.
INSTALLATION TIP
If the room floor is higher than the floor in the cutout 
opening, adjust the rear legs to achieve a total unit rear 
height of 1/8" (3 mm) less than the opening’s rear height. 
Shorten the unit height in the front by adjusting the front 
legs. This allows the unit to be gently tipped into the 
opening. Readjust the front legs to level the unit after it is 
correctly positioned in the opening.
INSTALLATION
1. Plug in the power/electrical cord.
2. Gently push the unit into position. Be careful not to 
kink the water supply line or entangle the cord.
3. Re-check the leveling, from front to back and side to 
side. Make any necessary adjustments. The unit’s top 
surface should be approximately 1/8" (3 mm) below 
the countertop.
4. Install the anti-tip bracket.
5. Remove interior packing material and wipe out the 
inside of the unit with a clean, water-dampened cloth.
1
Turn to Adjust
14










