Installation Manual
50
CAS-GPS IVU BASIC SYSTEMS INSTALLATION MANUAL DOCU0085 Revision Q
Test completed cable for continuity and short circuits by completing the following:
1. With both ends of the cable disconnected. Measure the resistance between the
inner and outer conductors. Must be open circuit (>10MΩ)
>10M
Testing Antenna cable terminations