Installation Manual
15
CAS-GPS IVU BASIC SYSTEMS INSTALLATION MANUAL DOCU0085 Revision Q
• Follow existing cable runs where possible.
• All cables to be secured using P-Clamps where possible.
• Cable ties should be used as a last resort where there is no provision for P-Clamps Ensure cable ties are
cut flush to avoid sharp edges.
• Cables should be secured at a minimum every 300mm.
• Cabling must be kept away from air bags, fire extinguishers & suppression systems in accordance with
local regulations.
• Avoid running cables near hot spots and pinch points.
• Glands should be used on cables running through bulkheads.
• It is recommended that a service loop be created on all the Antenna Coax Cables this will especially aid
in servicing of the system. i.e. Break in termination at either end of the Coax cables.
• Service loops are acceptable in the Coax and Display cables. Ensure if a service loop is placed in the
Coax Antenna cable that it is placed in a position that it is not going to create a hazard, also ensure the
service loop radius is not to small.
• If mounting through a blind panel the supplied Nutserts should be used to enable easy removal for
servicing.
Mounting Locations & Cable Runs