Owner manual

ULTRA-CUT 100 XT
3�34 INSTALLATION Manual 0-5272
3. Connect the gas supply lines and the control cable connector from the Gas Control Module to the Valve Kit as
shown.Holdthecheckvalvesstationarywhileattachingthegaslines.
Control Cable
Plasma Gas Inlet
Shield Gas Inlet
Preflow Gas Inlet
WMS™ Inlet
Art # A-07646
Exhaust Muffler
CAUTION
Hold all ings stationary while aaching hoses or leaks can be created. Side pressure can break the check valves
or weaken their connection to the torch valve assembly. All ings must be checked for leaks after assembly.
3.20 Connecting Torch
Connect the Torch as follows:
Art # A-09198
Pilot Lead Connector
Torch Head Assembly
Mounting Tube
O-Ring
Torch Leads End Cap
Plasma Gas
(Left Hand Thread)
Shield Gas
(Right Hand Thread)
Coolant Supply
&
Power Lead (-)
Pilot Lead
Coolant Supply,
Coolant Return,
and Pilot Leads
Leads Cover
Groove for O-Ring
To Torch Valve
1. Lay out the torch leads on a clean, dry working surface.
2. HoldtheTorchLeadsEndCapstationary.Pullapproximately18”(0.5m)ofleadsthroughtheEndCap.