Manual

ULTRA-CUT 100 XT
3-46 INSTALLATION Manual 0-5303
2. Afterthecompletesystemhasbeeninstalled,checkthatthecoolanthasbeenpumpedthroughthesystem
asfollows(seeNOTE):
NOTE
Depending on the length of the torch leads, the system may require more coolant after turning the system
ON for the rst time.
a. PlacetheON/OFFSwitchtoON.
b. Afterabout4minutesthesystemmayshutdowniftheleadsarenotfullofcoolant.
c. PlacetheON/OFFswitchtoOFF.Addmorecoolantifneeded
d. After10secondsplacetheON/OFFswitchtoONagain.
e. Repeatsteps‘b’through‘d’untilthesystemnolongershutsdown.Dependingonthelengthofthetorch
leadsthissequencemayneedtoberepeated.
f. Afterthesystemstaysoperationalallowthepumptooperatefortenminutestoproperlypurgeanyair
from the coolant lines before using the system.
3. Rellthereservoirandreinstallthellercap.
4. Purgecoolantfromthetorchbeforeringthetorch.Ensuretherearenoleaksbeforeuse.Ifleaksare
evident,consultthecoolantleaktroubleshootingguideinthemaintenancesectionofthismanual.