Full Product Manual
10
TP9KF-TUX
Mar 2019-A
STEP 7: (Installing / Routing EQUALIZER CABLES) Cont.
Cable Routing Diagram
Fig. 13
5. Repeat above for the second cable.
6. Adjust each equalizer cable to approximately 1/2” side-to-side play. Ensure that each cable has
equal tension. Check the carriage height to ensure both carriages are sitting on the same latch.