Product Manual

6
TP15KCX
Feb 2017
Fig. 3
(Column / Floor Layout)
1 OVERHEAD OBSTRUCTIONS: The area where the lift located should be free of overhead
obstructions such as heaters, building supports, electrical lines etc. (Figs 2 & 3.)
2 DEFECTIVE CONCRETE: Visually inspect the site where the lifts will be installed and check for
cracked or defective concrete.
3 FLOOR REQUIREMENTS: The lift should be installed on a 3000 PSI concrete with minimum of
4-1/4” thickness. The Floor should be level with-in gradients of ≦1/4” within area of the two columns
= 148” x 35”).
(See Details for Foundation Anchoring Requirements & Anchoring Tips on Page 4)