Product Manual

3
TP15KCX
Feb 2017
PREPARATION
The installation of this lift is relatively simple and can be accomplished by 2 men in a few hours. The following
tools and equipment are needed:
12 quarts of Non-Detergent / Non-Foaming Hydraulic Oil - SAE-10, AW 32 or equivalent
Chalk line and 12’ Tape Measure
4ft. Level
Rotary Hammer Drill with 3/4” Masonry Drill Bit. (Core Drill Rebar Cutter also recommended)
Hammer and Hex Key ‘Allen’ Wrench Set
Metric Sockets and Open Wrench set - 13mm-30mm
Medium Crescent Wrench and Medium Pipe Wrench
Crow Bar for Shim Installation and Medium Flat Screwdriver
Vise Grips, Needle Nose and Snap Ring Pliers
GENERAL INFORMATION
1. Carefully remove the crating and packing materials.
CAUTION! Be careful when cutting steel banding material as items may become loose and fall
causing personal harm or injury.
2. Identify the components and check for damage or shortages.
Please contact your distributor immediately, if any damages or shortages are discovered.
Packing:
The lift assembly is packaged into two columns as one piece.
Every column comes with its cylinder, carriage, cables & chains, lifting arms, swivel pads, height
extensions, hoses and overhead beam with the hardware box located in one of the columns.
The electric-hydraulic motor pump is packaged separately and banded to top of lift package.