Product Manual

8
B. Install the Equalizer Cables using the Routing for the lift as shown in the picture. The
cables should be taught, but no too tight. Be certain to tighten the jam nuts.
Cables are routed identically the same on both columns. Cable on right is routed down
and around the sheave then up and over the overhead beam. Then routed down to the top
of the carriage.
Be sure cables are seated securely on the sheaves.