Installation Guide

9
TC-950 & TC-950-WPA
July 2017
3.2.3 Use the wrench to remove the screw (Fig 6-3) Hexangular Shaft (Fig. 6-1) and take off the vertical
Shaft Cap (Fig. 6-2).
When removing the screw on the vertical shaft cap, youll need use the lock handle to lock the
hexangular shaft to avoid sliding off to damage the machine or cause injury to personnel!
Install the vertical Shaft Spring (Fig. 7-1) on the vertical shaft. Mount the vertical shaft cap and mount the
removed screw and assemble the hand wheel into the nut bushing of the rocker arm (Fig. 7-2).
3.2.4 Remove the Lock nut at the front end of the bead breaking / cylinder piston rod (Fig. 8-1) and use
the wrench to remove the nut on the bead breaking arm bolt (Fig. 8-4). Remove the bolt (Fig. 8-3) and
hang the spring (Fig. 8-2).
3.2.5 Position the bead breaking Arm Shaft Bushing into the bead breaking Support Plate on the body
(Fig. 9-1) to align the hole and install the bead breaking bolt (Fig. 9-2) and assemble the nut to lock (Fig.
8-4). Insert the piston rod (Fig.10-2) through the hole of the bead breaking slide bushing (Fig. 10-1). The
surface of the slide bushing should be facing outwards (Fig. 10). Assemble the removed nut (Fig. 8-1)
into the front end of the piston rod. The distance from the edge of the bead breaking blade to the bead
breakers rubber pad is 1-3/16 to 1-1/2 (30-40mm) as shown in Fig.11. Install the return spring (Fig. 9-3)
Note: If the machine is the one with the quick inflation feature; please open the side panel and insert 2 pieces
of Ø12 hose to the inlet of the quick inflation valve and to the Ø12 nozzle. Reinstall the side panel.
Fig
. 6
Fig. 7
Fig. 8
Fig. 9
Fig. 10