Installation Guide

9
Aug. 2019
SP-6K-SS
STEP 5
Position the two lift arms to the lifting frame (Fig.9 A). In order to make the runway platforms horizontal while
car is loaded, install the arms as follows:
First, lift up the far end of the arms with hydraulic jack to 3-15/16” (100mm) (Fig.9 B & C). Then tighten the
back side two screws and front one screw (Fig.9 D & E). Use the lock-nut to secure adjustments.
A B C
D E F G
Fig. 9
A, B, C, D, E, F, G (Setting-Up Arms)
STEP 6
Install the runways on the lifting arms. If they are hard to move, you can use a chain and a fence-stretcher to
help maneuver them. Position the runway platforms according to the fixing holes on the arms. Bolt the runways
to the lifting arms with the provided bolts. (Fig.10 A, B, C)
Fig. 10
A, B, C (Runway Attachment To Arms)