Installation Guide

5
Aug. 2019
SP-6K-SS
Required Tools
• Fork Lift to unload lift on delivery
• Fork Lift and/or engine hoist for moving pieces and positioning lift column. You will also need a ten-foot
length of 3/8” chain
• Metric wrenches and sockets with ratchet
• Adjustable wrench
• Small crowbar or large screwdriver for aligning bolt holes
• Concrete hammer drill with a new ¾” concrete bit
• Pliers
• Flat blade screwdriver and Philips screwdriver.
• Hydraulic floor jack on wheels or bottle jack, (for positioning pieces)
• 1-1/8" Socket & Extension
• 12mm Hex Socket
• Tin Snips
• 12 quarts of Non-Detergent / Non-Foaming Hydraulic Oil - SAE-10, AW 32 or equivalent
Optional Tools (May be helpful, depending on specific installation)
• Fence stretcher, for pulling ramps onto lift arms
Floor Requirements
• The lift should be installed on a 3000 PSI concrete with little gradients.
• Thickness of concrete: ≥ 6 inch (150 mm).
Receiving & Handling
• When you receive your lift, it will come banded in one large package, and you will need a forklift to
unload it.