Installation Guide

13
Aug. 2019
SP-6K-SS
OPTIONAL ACCESSORIES
The SP-6K-SS Lift has the ability to add Drip Trays between the Runways to assist in preventing any
vehicle oil and/or debris from falling on the floor or another vehicle parked under the runways.
NOTE: Drip Tray Rails are included with every SP-6K-SS Lift regardless if optional Drip Trays are
applied or not. If Drip Trays are not to be used, it is not required to install the support Rails.
IMPORTANT!
Based on how the Runways are installed, in either the ‘narrow or wide’ position will determine the specific
width size of ‘optional’ Drip Trays required to be ordered for the SP-6K-SS Lift. (See details below)
• ‘Narrow’ Runway Position: (P/N: FP9KDX-DT) - Drip Tray - 39"W
• ‘Wide’ Runway Position: (P/N: FP8K-DS/DX-XLT-DT) - Drip Tray - 42"W
Installation for Drip Tray Rails & Drip Trays
1. Locate and install Drip Tray support Rails to inside of Runways, using the #12 self-tapping screws
provided (Fig.15).
2. Place Drip Tray(s) on top of support Rails (Fig.16).
Fig.15 Fig.16