Installation Guide

9
SC-2K
Apr 2018
IMPORTANT!
The major piece of the lift is the column assembly. It consists of the carriage, hydraulic cylinder, chain
hydraulic hose and safety latch release cable already pre-assembled. The column assembly will
have a bracket on the side, which will be used for installing the power unit later. The cylinder in the
column may appear to be loose in the column, this is normal. After installation, when the platform is
raised under power, the cylinder should stabilize itself in an upright plumb position.
STEP 1
Carefully remove the shipping brackets. There is one bracket bolted to the underside of the column
(Figs. 3, 4, 5) and another bracket bolted to the side of the column (Figs. 6, 7, 8).
Fig. 3 Fig. 4 Fig. 5
Fig. 6 Fig. 7 Fig. 8
NOTE: If the base of the cylinder is not properly located in the center hole of the column’s
baseplate, it will be required to position it into the base plate hole before lifting the column
upright (Figs.9 & 10). If required, ensure to slide the carriage to base of the column, while
pulling the lock-release cable at the same time (Fig.11).
Fig. 9 Fig. 10 Fig. 11