Installation Guide

4
SC-2K
Apr 2018
REQUIRED TOOLS
The installation of this lift is relatively simple and can typically be accomplished by 2 men in a
few hours. The following tools and equipment are needed or recommended.
Fork Lift and/or Engine Hoist for moving pieces & positioning lift column, is recommended.
(You will also need a ten-foot length of 3/8” chain.)
Rotary Hammer Drill with 3/4” Masonry Drill Bit. (Core Drill Rebar Cutter recommended)
6 quarts of Non-Detergent / Non-Foaming Hydraulic Oil - SAE-10, AW 32 or equivalent
1” and 5/16” Wrench & Socket with Ratchet
1” and 1/8” Socket & Extension
1/2” Wrench
11/16” Wrench
Adjustable Wrench
Small Crowbar or large Screwdriver for aligning bolt holes
Pliers
Flat Blade Screwdriver
Tin Snips
Gloves
GENERAL INFORMATION
1. Carefully remove the crating and packing materials.
CAUTION! Be careful when cutting steel banding material as items may become loose
and fall causing personal harm or injury.
2. Identify the components and check for damage or shortages.
Please contact your distributor immediately, if any damages or shortages are
discovered.
PACKAGING
The SC-2K lift assembly is packaged & shipped as two large pieces - Column & Platform
assemblies.
The SC-2K column comes with cylinder, carriage & chain with the hardware box located
inside the column.
The SC-2K platform comes with frame and aluminum decking.
The electric-hydraulic power unit is packaged separately and banded to top of platform.