Installation Guide
11
SC-2K
Apr 2018
STEP 5
a) Attach the power unit to the mount bracket on the side of the Column using the M8 Bolts,
Washer and Lock Nuts supplied with Power Unit (Fig.17).
b) Remove the red plug from valve body and install the Elbow Fitting (Figs. 18 & 19).
Fig. 17 Fig. 18 Fig. 19
c) Connect one end of the Hydraulic Hose to the Elbow Fitting installed on Power Unit (Fig. 20).
d) Connect the other end of Hydraulic Hose to the cylinder fitting located on the lower backside of
Column (Fig.21).
NOTE: Ensure all hydraulic connections are properly tightened. Do Not Over Tighten.
Fig. 20 Fig. 21
e) Remove black vent cap from power unit’s reservoir and fill with hydraulic oil. Make sure the
funnel used to fill the power unit is clean. Ensure Not to Fill Above Max Fill Line.
NOTE: Use Non-Detergent / Non-Foaming Hydraulic Oil - SAE-10, AW 32 or equivalent. The
Power Unit’s reservoir holds approximately 6 quarts of fluid.
f) (Optional) Secure Hydraulic Hose to Column using Hose Clamps & M4 Screws.
STEP 6
Connect the power unit’s cord with plug w/ grounding pin to electrical 110-115VAC power source. If an
extension cord is required, ensure the proper gauge extension cord is used. If there is any question
on the power source requirements, please consult an electrician.
STEP 7
Recheck all bolts for tightness. Installation is now complete.
The SC-2K Lift is now ready for Operation