Installation Guide
10
SC-2K
Apr 2018
STEP 2
Using two people, carefully stand the column upright and maneuver to the predetermined location
(Figs.12 & 13).
Fig. 12 Fig. 13
STEP 3
Before proceeding, double check measurements and make certain that the base of the column is
properly aligned and in the desired location before anchoring column to floor.
a) Using the base plate on the column as a guide, drill each anchor hole into concrete using a
rotary hammer drill and 3/4” concrete drill-bit. To assure full holding power, do not ream the
hole or allow the drill to wobble. (See Anchoring Details on Page 4)
b) After drilling, remove dust thoroughly from each hole using compressed air and/or wire brush.
c) Assemble the washers and nuts on anchors then tap into each hole with a block of wood or
rubber hammer until the washer rests against the base plate. If shimming is required, ensure
that enough threads are left exposed to properly tighten.
d) Using a level, check that the column is plumb (sides only). If shimming is required, use
supplied Shim stock or 3/4” washers, placing shims as close as possible to the anchor holes
locations. This will prevent potential bending for the column base.
e) With the shims and anchor bolts in place, tighten by securing the nut to the base then turning
2-3 full turns clockwise. Ensure anchor bolts are tightened to a minimum of 130 ft-lbs. of
torque. DO NOT use an impact wrench for this procedure.
STEP 4
Remove Aluminum Decking & secure Platform Frame to Carriage using M20 Bolts, Washers & Nuts.
Once Platform is mounted, place Aluminum Decking back on the Platform (Figs. 14, 15 & 16).
Fig. 14
Fig. 15
Fig. 14 Fig. 15 Fig. 16