Product Manual

4
RJ-45
July 2017
INSTALLATION INSTRUCTIONS
1. Carefully remove rolling jack from crate package.
2. Pump jack to top by the hand pump. Check that the hydraulic oil quantity is enough and
hose is properly connected.
3. Lower the jack completely down by moving the lock release lever to the right, while turning
the hydraulic release valve knob counter-clockwise.
4. Slide out the roller body assembly extensions on both sides to match the width between
the runways.
5. Place the jack on the rails of the runways (Fig. 3), while ensuring to center the jack
between runways.
6. Remember to secure the roller body assembly extensions into position by tightening the
bolts after the jack is centered (Fig. 3).
NOTE: Make sure the jack can roll freely in jack rails and all rollers make contact with
the runways.
Fig. 3
SAFETY INSTRUCTIONS
Never allow unauthorized or untrained persons to operate the rolling jack.
Thoroughly train all employees in the use and care of rolling jack.
Never overload rolling jack. Capacity of rolling jack is stated on the nameplate. Capacity
should not be exceeded.
Observe and avoid any pinch point areas of the linkage mechanism.
DO NOT OVERLOAD JACK!!!
DO NOT OVERLOAD JACK!!!DO NOT OVERLOAD JACK!!!
DO NOT OVERLOAD JACK!!!
roller body
extension bolts