Installation Guide

3
1.
2.
3.
4.
5.
Place upright rails on side. Slide rails inside
uprights (Fig. 1).
Fig. 1
Fig. 2
Fig. 3
Fig. 4
Align the rails to be 90º to the upright (Fig. 2.)
Install outside screws (Fig. 3).
Install adaptor strip. Install boards. Install
opposite adaptor strip. Install remaining upright
(Fig. 4)
Repeat Steps 2 & 3 for opposite gate upright.
90º
Adaptor
Strips
Adaptor
Strips
Boards
Upright
Option 1
Option 2
Upright
Upright
Upright
Determine Gate Opening:
Refer back to “How to Measure”
Gate opening is determined by width of gate plus clearance for
hinge, latch, and drop rod (latch and drop rod sold separately);
refer to latch and drop rod installation instructions for speci c
space requirements.
Determine
location and gate
opening before
installing fence.
Boards
Boards
Boards