Instructions / Assembly
4
4.
Assemble Fence (Vertical Board Installation):
a. On rst post insert the rail into the post channel
and line up the holes of bottom rail and bottom
of post. Make sure the open pocket in the rail
is facing up (Fig. 5). Insert pin (from post kit).
b. On second post, insert the opposite end of the
bottom rail into place, align holes, and insert pin.
c. Snap adapter strips into post channels on both
posts (Fig. 6).
d. Begin inserting boards, starting on the outside
of both posts working your way towards the
center (Fig. 7). Be sure tongue and grooves of
boards are aligned in the proper directions.
e. Line up holes in top rail and top of post and
insert rail into the post channel. Make sure
the open pocket in the rail is facing down.
Insert pin. Repeat for opposite side (Fig. 8).
f. Snap post cover (from post kit) into place by
holding cover approximately 6" from top of
post. Hook one side of the cover and push
down to snap the other side. Slide the cover
down the post to hide the pins (Fig. 9). Repeat
for other post.
g. Install post cap (from post kit) to top of post.
Use a soft rubber mallet, if necessary to obtain
a rm t (Fig. 10). Repeat for other post.
NOTE:
“Top” and “Bottom” rails are the same.
Fig. 5
Fig. 6
Fig. 7
Fig. 8
Fig. 9
Fig. 10
Hook
Hook
Hook &
Hook &
Snap Snap
Post Cover
Post Cover
Post
Channel
Open Pocket