Installation Guide
process for the other two corners, measuring again from the 
high point corner, writing down your measurements.
Now you can determine the distance your build site is out of 
level and select a method to level the site.
 6 ROOF TRUSS TYPES
The type of roof truss that comes standard with your 
building will vary by the roof type, pitch (steepness) and 
building width. This is especially important on buildings 
starting at 12’ wide as these trusses include a bottom 
chord or collar tie (see diagrams below) that can impact the 
amount of usable space overhead.
See truss examples here and contact the TUFF SHED factory 
with questions.
 7 INSTALLATION DAY
Your TUFF SHED building is about to become a reality. 
Important details for installation day:
•  Our installers will arrive on the site, unload materials and 
components, and begin to assemble your building.
If you purchased a display building, our delivery driver 
will arrive on the site, review your desired building 
location, and the access route for his truck and trailer. 
•  Please have someone over the age of 18 at home.
•  An out of level site will force our installers to stop work and 
collect an additional leveling fee prior to resuming.
•  Our installers will need a power source so they can plug in 
the compressors that power their tools.
•  Inspect the building before the installers leave for the day.
•  It may surprise you – but like most home builders, the 
weather seldom interferes with installation. 
Rain, snow, and sleet will most likely not prevent 
installation and will not damage the structure during 
installation. Ask for details. 
 8 HOW WE PAINT
If you have selected the paint upgrade on a new building, 
then TUFF SHED will paint your building. Here’s our 
painting process:
•  Before being transported to the building site, the rst 
coat of paint is applied at our factories by roller to exterior 
siding and trim surfaces. 
•  The second coat of paint is applied during on-site 
installation. A Seasonal Second Coat Paint Discount is 
available in select winter markets during cold/wet months. 
If this discount has been applied to your order, then the 
installers will not apply the second coat of paint to your 
building during installation regardless of weather at the 
time of install. 
•  Customers who have received our Seasonal Second Coat 
Paint Discount will be provided with siding and trim paint, 
a roller and two small brushes. These customers should 
apply the second coat of paint to their building on a dry 
day when the temperature is higher than 35 degrees. 
Display buildings received the rst and second coats 
of paint prior to being put into service as a display. No 
additional painting will be included in the purchase.
 9 PROPER CARE AND MAINTENANCE
Your TUFF SHED building will need routine care & 
maintenance to ensure the building withstands things 
like weather and wear & tear over time:
•  Keep your Building on the Level – When normal 
ground settling occurs, it can aect your TUFF SHED 
building, making it dicult to open, close or latch the 
door. This is not a warranty issue, but in most cases, 
the building can be easily re-leveled by the customer 
or for a reasonable fee by TUFF SHED.
•  Protect your Floor – Do not add rubber mats or vinyl 
ooring inside as they can create a serious moisture and 
rot issue. Do not block oor track vent holes.
High Point 
Stake
Low Point 
Stake
Inches out of level
String Level
String