Installation Guide
Your Tu Shed building is about to become a reality. 
Important details for installation day:
•  Our installers will arrive on the site, unload materials and 
components, and begin to assemble your building.
•  Please have someone over the age of 18 at home.
•  An out of level site will force our installers to stop work and 
collect an additional leveling fee prior to resuming.
•  Our installers will need a power source so they can plug in 
the compressors that power their tools.
•  Inspect the building before the installers leave for the day.
•  It may surprise you – but like most home builders, the 
weather seldom interferes with installation. Rain, snow, and 
sleet will most likely not prevent installation. Ask for details.
You’ve decided on the building style, size and design, 
and nalized your purchase. Important prep work 
remains for you and for us, including:
• Youwillbecontacted within 24-48 hours to schedule your 
installation.
• BuildingPermit(s)/HOARequirements – Customers need 
to conrm with their HOA and/or municipality for appropriate 
building permit requirements. Contact us immediately if you 
need help.
• PreparetheJobSite – Clean the site of all debris (i.e. old 
tree stumps, trash, dog waste, etc) and level the site. If the 
site is more than 4” out of level, a charge will apply.
•  Keep your Building on the Level – When normal ground settling occurs, it can aect your Tu Shed building, 
making it dicult to open, close or latch the door. This is not a warranty issue, but in most cases, the building can 
be easily re-leveled by the customer or for a reasonable fee by Tu Shed.
•  Redirect Water – Water is the enemy of most structures. Take care to redirect water from your building whenever 
possible. Rain water runo from other structures and misdirected irrigation systems can damage your Tu Shed 
building, and is not covered by warranty.
•  Re-paint Regularly – Painting is one of the easiest ways to protect the exterior wood surfaces of a Tu Shed 
building. Your building’s warranty coverage requires that the building be re-painted every ve years. We 
recommend using high quality materials like PPG Paints.
•  Do not add rubber mats or vinyl ooring inside as they can create a serious moisture and rot issue.
PRE-INSTALLATION PROCESS
PROPER CARE & MAINTENANCE
INSTALLATION DAY
Building components pre-fabricated 
and ready for delivery
Building components being carried 
into place for on-site installation
WHAT TO EXPECT
TAHOE SERIES SHEDS


