Assembly Instructions
1 Attach casters to legs of lower front (L1)
and lower back (L2) panels.
2
a
THIS STAGE REQUIRES TWO PEOPLE.
Attach left side lower (L3) panel to
front lower (L1) panel.
→
Channels on (L3) face toward interior of cage.
Install bottom and middle screw only.
Leave top screw out until STEPS 4a & b.
2
b
Attach right side lower (L4) panel to
front lower (L1) panel.
Attach back lower (L2) panel to sides,
continuing to attach with only bottom and
middle screws.
3 After lower cage has been assembled,
slide in the grille (A) and drawer (B).
steps
4
a
THIS STAGE REQUIRES TWO PEOPLE.
Back upper (U2) panel fits into back bottom
(L2). When post is aligned with hole,
secure panel with screw.
→
Have first person hold (U2) panel upright—
so as not to bend posts—while second person
secures panel.
4
b
Front upper (U1) panel fits into front bottom (L1).
When holes are aligned, secure panel with screws.
→
Again, have first person hold upper panel upright.
4
c
Side upper (U3 – with one cup door; U4 –
with two cup doors) panels are interchangeable.
→ Make sure cup doors swing out (not into cage).
Slide side upper panel into channels on
back upper (U2) and front upper (U1) panels.
→ May require two people or standing on a chair.
Three vertical wires on (U3) and (U4) panels
extend below lower horizontal wire. Align wires
with corresponding holes along top rail of side
lower panel [ (L3) or (L4) ].
5 With lower and upper portions of the cage assembled,
this is an easy time to add cup holders/stainless
steel cups to the side panel cup doors, and to install
the wooden dowel perch.
L1
L3
L4
L2
A
B
U2
U3
U4
U1
L2