Assembly Instructions

1 Attach casters to legs of lower front (L1)
and lower back (L2) panels.
2
a
THIS STAGE REQUIRES TWO PEOPLE.
Attach left side lower (L3) panel to
front lower (L1) panel.
Channels on (L3) face toward interior of cage.
Install bottom and middle screw only.
Leave top screw out until STEPS 4a & b.
2
b
Attach right side lower (L4) panel to
front lower (L1) panel.
Attach back lower (L2) panel to sides,
continuing to attach with only bottom and
middle screws.
3 After lower cage has been assembled,
slide in the grille (A) and drawer (B).
steps
4
a
THIS STAGE REQUIRES TWO PEOPLE.
Back upper (U2) panel fits into back bottom
(L2). When post is aligned with hole,
secure panel with screw.
Have first person hold (U2) panel upright
so as not to bend postswhile second person
secures panel.
4
b
Front upper (U1) panel fits into front bottom (L1).
When holes are aligned, secure panel with screws.
Again, have first person hold upper panel upright.
4
c
Side upper (U3 with one cup door; U4
with two cup doors) panels are interchangeable.
Make sure cup doors swing out (not into cage).
Slide side upper panel into channels on
back upper (U2) and front upper (U1) panels.
May require two people or standing on a chair.
Three vertical wires on (U3) and (U4) panels
extend below lower horizontal wire. Align wires
with corresponding holes along top rail of side
lower panel [ (L3) or (L4) ].
5 With lower and upper portions of the cage assembled,
this is an easy time to add cup holders/stainless
steel cups to the side panel cup doors, and to install
the wooden dowel perch.
L1
L3
L4
L2
A
B
U2
U3
U4
U1
L2