Installation & Assembly

D 3
A 3 5
2
b
PARTS NAME QTY
A35 Long Tube ( 4 )
D3 Hideaway Den ( 1 )
To finish the BASE (pt.2), add
the HIDEAWAY
. You will need
these pieces:
Add horizontal posts to
the corner unit.
Open up the velcro
sleeves on the ends.
Slide the hideaway
onto the top horizontal
posts.
Add the assembled unit
to the Base (pt.1).
Along the top edge of the hideaway,
secure the velcro sleeves around
the horizontal tubes.
Secure the loose flap
from the top edge of the
corner panel to the top
of the hideaway.
4 C
4 C
2S
3C
B 2 8
A 3 5
4 C
2S
B 2 8
A 3 5
5 C
A 1
Start by assembling the curve.
Insert the tubes and connectors into the
base of the corner panel fabric.
Add the self-adhesive foam pads.
Next, add the
sisal post on the
inside of the corner.
NOTE: The stiff
panel forms the
vertical side wall
2
a
PARTS NAME QTY
2 S 2-Way Straight ( 2 )
3 C 3-Way Corner ( 1 )
4C 4-Way Corner ( 3 )
5 C 5-Way Corner ( 1 )
A35 Long Tube ( 4 )
A1 Sisal Post ( 1 )
B 2 8 Short Curve ( 4 )
E2 Corner ( 1 )
Foam Pads ( 3 )
To form theBASE (pt.2), start
with the CORNER
. You will need
these pieces:
Assemble the curve first, then finish the corner by
inserting the remaining tubes and connectors into the
fabric.
Leave the velcro flap along the top edge loose for now.