Installation & Assembly
6C
5C
5 C
4 C
A 3 5
1
b
Assemble the unit,
then add it to the base.
PARTS NAME QT Y
4 C 4-Way Corner ( 1 )
5 C 5-Way Corner ( 2 )
6C 6-Way Corner ( 1 )
A35 Long Tube ( 4 )
To begin the 1st floor, you will
need these pieces:
B 2 8
A 3 5
3S
3 S
S 1
1
c
PARTS NAME QT Y
3 S 3-Way Straight ( 2 )
A35 Long Tube ( 1 )
B 2 8 Short Curve ( 4 )
S1 Ramp ( 1 )
To form the 1st floor RAMP,
you will need these pieces:
When building sections
with fabric pieces,
insert tubes into the
sleeves of the fabric
first, then add the
connectors.
⁕
Open the velcro sleeve along
the top edge and secure it
around the horizontal tube.
Assemble the ramp and then
add the unit to the base.
PARTS NAME QTY
A35 Long Tube ( 3 )
A1 Sisal Post ( 1 )
Then these pieces:
A 3 5
A 1
Add vertical posts to
the base as shown.